First: identify the system and the responsible body
- Active sewage escape, flooding or an immediate hazard: stop routine DIY planning. Use the relevant undertaker or local authority’s official incident route; do not enter a chamber or unstable excavation.
- Wastewater drain or sewer: check your sewerage bill for the actual undertaker. Do not assume every North Wales property is served by Dŵr Cymru. Ask the undertaker to resolve uncertain asset ownership.
- Private pipe: Dŵr Cymru’s guidance says pipes serving only your property inside its boundary are your or your landlord’s responsibility. Shared pipes or those outside the boundary are probably the undertaker’s; “probably” is not an ownership determination. A confirmed private blockage needs a competent drainage contractor, not this resource.
- Highway drain, land drain or watercourse: these are not automatically public sewers. The council, landowner and/or Natural Resources Wales may be involved. Dŵr Cymru warns that maps can contain classification errors.
Sources: Dŵr Cymru: sewer responsibilities and Welsh Government: drains and sewers, accessed 15 October 2026. Ask the responsible body to confirm the actual case rather than extending a general diagram into a legal boundary.
New work: permissions are separate questions
Welsh Government says building over or close to a public sewer requires written agreement from the sewerage undertaker. Building-control requirements and the relevant Welsh Approved Document H also need checking. These are separate from agreeing a connection, access or discharge.
For surface-water development, check the local authority’s SuDS Approval Body (SAB) before construction. The Welsh Government SuDS collection links the current standards and guidance. The current Welsh statutory guidance provides scope and approval detail. Ask the SAB about construction-area thresholds, exceptions and your total development; a footprint calculation here cannot decide approval. Do not apply surface-water SuDS rules as a foul-drain design recipe.
Fictional measured-level example — one datum throughout
These numbers illustrate subtraction, not surveyed site data or an approved ratio. A competent survey supplies the real readings without chamber entry. Invert means the internal bottom level of the pipe; it is not the cover, ground or excavation base. Use the same benchmark and units at every station. Higher reduced levels mean physically higher points.
| Station | Distance from A | Datum minus measured vertical offset | Invert reduced level |
|---|---|---|---|
| A | 0 m | 11.200 − 1.200 | 10.000 m |
| B | 12 m | 11.200 − 1.350 | 9.850 m |
| C | 20 m | 11.200 − 1.450 | 9.750 m |
A–B drop = 10.000 − 9.850 = 0.150 m = 150 mm; ratio = 12 ÷ 0.150 = 80. B–C drop = 0.100 m = 100 mm; ratio = 8 ÷ 0.100 = 80. Total A–C = 0.250 m over 20 m, also 1:80. The pipe-fall calculator checks entered run and ratio arithmetic; it does not select that ratio or approve a connection. A proposed outlet at 9.800 m would provide only 200 mm total drop from A, 50 mm less than this fictional 1:80 target. That mismatch requires design review, not automatic digging deeper.
Invert is not trench depth
If ground level at B were 11.300 m, ground-to-internal-invert would be 11.300 − 9.850 = 1.450 m. The excavation base is a different level: external pipe geometry, wall thickness, selected bedding, supports and ground profile still matter. Do not enter 1.450 m automatically as the trench quantity calculator’s average excavation depth. Get that depth from the actual excavation design.
Record before proceeding
Job/reference ______ · undertaker/asset confirmation ______ · consents ______ · survey benchmark ______ · station/ground/invert readings ______ · drawing revision ______ · designer/competent reviewer ______.
Use the access boundary check to organise unresolved conditions. Read HSE excavation guidance and HSG47 underground-services guidance. Arithmetic never permits chamber entry, unsupported excavation, pumping or connection.