Why this is a boundary check
Pump selection depends on a duty point, not a headline maximum-head figure. This check records what you need for that comparison; it does not work out the duty point for you.
Stop classes
- Sewage, chemical, fuel or unknown contamination.
- No confirmed discharge destination or permission.
- Unknown liquid.
Dirty water or visible solids routes the result to a specialist duty check. Clean-water observations with no visible solids still require a complete manufacturer-curve comparison.
Once the liquid, duty point, power, lawful discharge route and the effect on excavation stability have been confirmed, compare water pump hire options against verified manufacturer curves.
Pump duty-point evidence sheet — blank, not a selection
Grundfos: duty point describes the intersection of a pump Q–H curve and system characteristic. Its heating-system explanation supports that concept, not selection of a drainage pump. Head and hose length alone cannot establish the operating flow. This sheet supplies no product curve, friction constant or invented model recommendation.
| Job / date / competent reviewer | ________________ |
|---|---|
| Liquid / temperature / contamination / solids | ________________ |
| Required flow and units; source of requirement | ________________ |
| Static lift; suction/discharge levels and datum | ________________ |
| Hose internal diameter / length / fittings | ________________ |
| Friction losses at flow; method and source | ________________ |
| Total required head at flow = static lift + documented losses (consistent units) | ________________ |
| Pump maker / exact model / speed / curve revision | ________________ |
| Curve URL / page / Q–H point / operating limits | ________________ |
| Power / priming / solids / lawful discharge / stability | ________________ |
| Unresolved evidence and next competent decision | ________________ |
Keep the actual manufacturer chart with this record. Check units and operating envelope; a maximum-head or maximum-flow headline is not a shared operating point. Do not proceed while contamination, power, discharge or excavation stability remains unresolved. Browser print includes this sheet; no equipment has been selected. Download the blank duty-point evidence sheet (text).
Sources
Its safety limits use HSE excavation guidance; ownership and lawful discharge remain project-specific. See the sources and decision order.