Planning resource · Not an emergency service
Planning tool · Selection boundary

Pump suitability boundary

Capture liquid type, solids, total head, hose length, power and discharge route before comparing a manufacturer’s verified pump curve.

Comparison boundary · Does not recommend a pump
Worked example only: JavaScript is unavailable. The fixed example describes clean water, no visible solids, 4 m total head, 15 m hose and confirmed power and discharge route.
liquid
mm
metres
Use your best estimate from the site levels.
metres
power
route
The output does not calculate flow, friction loss, duty point or run time. Compare the complete duty requirement with a manufacturer’s verified curve and operating instructions.
Worked example · Default entered values

Compare verified pump curves

Use the entered 4.0 m total head and 15.0 m hose length as part of a complete duty-point check against manufacturer data.

Clean waterYour liquid
0 mm solidsLargest solids
Inputs and assumptions

Entered observations: clean water · 0 mm solids · 4.0 m total head · 15.0 m hose · power confirmed · discharge route confirmed. Use these planning inputs when comparing a verified pump curve.

Blank field worksheet

Job/reference
Date
Liquid description
Largest observed solids (mm)
Estimated total head (m)
Hose length (m)
Power source checked
Discharge route checked
Candidate pump/model
Curve/duty point checked
Checked by

Why this is a boundary check

Pump selection depends on a duty point, not a headline maximum-head figure. This check records what you need for that comparison; it does not work out the duty point for you.

Stop classes

  • Sewage, chemical, fuel or unknown contamination.
  • No confirmed discharge destination or permission.
  • Unknown liquid.

Dirty water or visible solids routes the result to a specialist duty check. Clean-water observations with no visible solids still require a complete manufacturer-curve comparison.

Do not pump simply because water is present. HSE notes that pumping from sumps can affect excavation stability. The discharge destination, contamination, electrical supply and effect on the excavation require separate assessment.

Once the liquid, duty point, power, lawful discharge route and the effect on excavation stability have been confirmed, compare water pump hire options against verified manufacturer curves.

Pump duty-point evidence sheet — blank, not a selection

Grundfos: duty point describes the intersection of a pump Q–H curve and system characteristic. Its heating-system explanation supports that concept, not selection of a drainage pump. Head and hose length alone cannot establish the operating flow. This sheet supplies no product curve, friction constant or invented model recommendation.

Job / date / competent reviewer________________
Liquid / temperature / contamination / solids________________
Required flow and units; source of requirement________________
Static lift; suction/discharge levels and datum________________
Hose internal diameter / length / fittings________________
Friction losses at flow; method and source________________
Total required head at flow = static lift + documented losses (consistent units)________________
Pump maker / exact model / speed / curve revision________________
Curve URL / page / Q–H point / operating limits________________
Power / priming / solids / lawful discharge / stability________________
Unresolved evidence and next competent decision________________

Keep the actual manufacturer chart with this record. Check units and operating envelope; a maximum-head or maximum-flow headline is not a shared operating point. Do not proceed while contamination, power, discharge or excavation stability remains unresolved. Browser print includes this sheet; no equipment has been selected. Download the blank duty-point evidence sheet (text).

Sources

Its safety limits use HSE excavation guidance; ownership and lawful discharge remain project-specific. See the sources and decision order.

Want to see how each check decides?

Read methodology