Approved Document H: drainage and waste disposal
Used as the primary Welsh building-regulation guidance route for drainage, pipework, protection and access. The landing page says amendments must also be consulted.
Open Approved Document H on GOV.WALESBuilding regulations: drains and sewers
Supports boundaries around foul versus surface-water systems, owner permission, locating drains, avoiding chamber entry, access for clearing blockages and obtaining competent advice.
Open drains and sewers guidance on GOV.WALESExcavations
Supports the hard boundary around collapse, falling material, nearby structures, services, water inflow, competent inspection and the effect of pumping on stability.
Open HSE excavations guidanceAvoiding danger from underground services
Primary HSE route for planning and managing work on or near underground services. It explains why a trench quantity is never treated here as permission to dig.
Open HSG47 on HSESafe work in confined spaces
Supports the stop rule for proposed entry into a chamber, manhole or other space meeting the confined-space definition and foreseeable specified risks.
Open L101 PDF on HSESewer responsibilities
Supports the distinction between private pipes within a property boundary and pipes outside a boundary or serving multiple properties, plus the instruction to contact the undertaker when responsibility is uncertain.
Open sewer responsibilities on Dŵr CymruPart H technical guidance
Supports the distinction between transparent fall arithmetic and project-specific design. The guidance links gradients to pipe diameter, flow and layout, requires access where blockages could not otherwise be cleared, and refers pumped systems to separate standards and design considerations.
Open Approved Document H PDFNew sewer connections
Within Dŵr Cymru’s operating area, a new or reused public-sewer connection requires approval. Live application forms, charges and timescales remain on the undertaker’s current page rather than being copied into this planner.
Open Dŵr Cymru connection guidanceBuilding over or near sewers
Within Dŵr Cymru’s operating area, work over or within three metres of a public sewer or lateral drain must be referred to the undertaker. Location, diameter, material and depth need to be established before design or excavation.
Open Dŵr Cymru build-over guidanceSustainable drainage systems
Wales has separate national standards for surface-water drainage. A foul-drain fall or trench calculation does not decide whether SuDS approval is required or whether a surface-water proposal satisfies those standards.
Open Welsh SuDS standardsHow these sources are used
A source supports only the specific boundary described above. It does not validate your measurements, select a ratio, recommend a pump, certify a trench or establish legal responsibility for a particular pipe. Links and summaries are rechecked when guidance changes; the date above shows the last check.