Planning resource · Not an emergency service
Method · Version 1.0.0

Methodology

Every result is derived from visible entered values. This page records formulae, validation limits, decision order, rounding and exclusions for release 1.0.0.

Formula version 1.0.0 · Research checked 16 September 2026

Common principles

  • If a field is blank, not a number or outside the accepted range, no result is shown.
  • As soon as you change a value the result clears; it recalculates when you press the button.
  • Full precision is retained internally; rounding is applied only to displayed values.
  • Your inputs and assumptions are shown beside every result.
  • Results show planning arithmetic or a triage outcome; they never give permission, confirm compliance or choose a working method.

Pipe fall

exact drop (mm) = measured run (m) × 1,000 ÷ entered ratio

gradient (%) = 100 ÷ entered ratio

Accepted ranges: run 0.1–500 m, ratio 10–1,000, nominal diameter 32–1,200 mm, recording step 1, 5 or 10 mm. Diameter is recorded but does not alter the formula. The page does not select a ratio.

Trench and bedding quantities

excavation (m³) = length × average width × average depth

selected bedding zone (m³) = length × average width × entered bedding depth

loose spoil (m³) = excavation × entered bulking factor

Accepted ranges: length 0.1–500 m, width 0.1–5 m, depth 0.1–10 m, bedding depth 0.01–2 m but not greater than trench depth, factor 1.0–2.5. Rectangular geometry only. Pipe displacement, overbreak, supports, widening, chambers and water are excluded.

Drain access decision order

  1. Any named hazard, unknown condition or active overflow shows a stop result.
  2. Shared or unknown responsibility, no known access point or a recurrent blockage directs you to professional inspection first.
  3. Only a private drain with a known access point, a non-recurrent symptom and no stop condition reaches the planning step.

The check never tells you to rod, jet, enter or excavate.

Pump boundary decision order

  1. Sewage, chemical, fuel, unknown liquid or an unconfirmed discharge route shows a stop result.
  2. Unknown power information asks you to confirm the power plan first.
  3. Dirty water or visible solids directs you to a specialist duty check.
  4. Clean water with no visible solids and confirmed power and discharge directs you to compare verified manufacturer curves.

Accepted ranges: largest solids 0–150 mm, estimated total head 0–50 m, hose length 0.5–250 m. The page does not calculate friction loss, flow, duty point, power demand, run time or model fit.

No-JavaScript behaviour

Each tool shows a fixed worked example before JavaScript runs. The no-JavaScript banner states that controls are not live. When scripting loads, the form computes from the current entered values and any later edit invalidates the current result.

Versions and updates

If a formula, range, safety rule or source interpretation changes, the version number and research-check date change with it. Official guidance changes; check the linked source before relying on a summary here. Dŵr Cymru material applies only where Dŵr Cymru is the relevant undertaker; the property’s undertaker must be confirmed. Surface-water proposals may also sit within Wales’s separate SuDS approval framework.